Ride Date: 03/26/2022 Miles Covered: 463 GTGA Locations: 4 of 24 Total Ride Time: 10h29m Total Moving Time: 8h10m Weather Outlook: Dry, Sunny, 45° 2022 started, in regards to riding, pretty slowly. N...Read More
Auchumpkee Creek Covered Bridge, Thomaston. This is rebuilt covered bridge located on Allen Road which runs between SR-3/19 and SR-80. The bridge was originally built in 1892 and was constructed as a ...Read More
Red Oak Covered Bridge, near Woodbury, GA. This covered bridge built in the 1840’s, by freed slave and noted bridge builder, Horace King, is 391 feet long including the approaches. The structure is ...Read More
Miles Covered: 233Destination: Euharlee, TrionWeather Outlook: High: 72°F, Low: 54°F Initially planned for Saturday afternoon, but life got in the way and the GTGA ride was pushed out to a muc...Read More
March 14, 2015 Start Odo: 4124 End Odo: 4261 Miles Covered: 137 Destination: Talking Rock, GA and Blue Rige, GA Weather Outlook: High: 71°F, 21°C | Low: 53°F, 12°C | AM Showers. Cloudy and Overcas...Read More
I wrote earlier about the Grand Tour of Georgia (GTGA) Kicking off. The Start date is March 14, 2015 – Saturday. The organizers push through all the information via email on the Wednesday prior ...Read More
Mid February, amidst that horrible cold low temperatures, the anticipation for the GTGA 2015 grows. It all starts off with some ‘teaser trailer’ update posts on the Facebook Group – ...Read More